Showing posts with label land. Show all posts
Showing posts with label land. Show all posts

Sunday, February 20, 2011

Snow Much Fun

Last weekend, the weather was absolutely glorious, especially since we had just emerged from a frigid deep freeze. The kids and I spent most of Saturday in the house cleaning out and organizing the toy boxes, doing laundry...yada, yada, yada...Much like what we did today because we are getting hit with another huge storm (or at least we are supposed to be, but thus far there's only been a little snow and lotsa wind) but that is a whole nother story.
Since we finished all of our chores on Saturday, we deemed Sunday a fun day! It was in the 40's, sunny and the perfect day bundle up and head outside to climb the snowbanks and have a good old fashioned snowball fight!
Well...the kids did all of the snowball throwing and I dodged them while attempting to capture a couple of good action shots!Roxy was even having a blast blazing through the snow drifts and chasing the stray snowballs.This little stinker has a pretty darn good arm, too! Thankfully I was able to dodge all of his bullets :)

It is such a good feeling to watch your children living life, having fun and enjoying the little things in life like playing in the snow on a sunny Sunday afternoon.
It warms my heart to no end.
After all, it is moments like these that they will remember for years to come...or at least I know I will.

post signature

Thursday, August 5, 2010

Getting closer by the day...

The long awaited 'Shop Update' has arrived!This building sure has been keeping us busy (and our pockets empty) this summer!

I will spare you the step by step pictures that led us to the inside being (almost) done.
The pic below is me standing inside the overhead door and to the right. In front of me are two 'pits' where motorcycle lift tables will go. The room in front of that is the 'fabricating room' aka the 'dirty room' where Duke will have his grinder, machining tools, welder, etc.
This is a look inside the fab room. He has started to move some of his equipment in since this pic was taken but that will have to be for another day.
To the left of that is the hallway (duh!) and then further to the left is the 'dyno' room.
The dyno room that is filled full of JUNK, that is! While the electrician has been working this room has become the catch all for all of the stuff. If you look close you can see that the walls are made of peg board (there is also a second wall with sheetrock behind the peg board) and the hope is that it will help to muffle the sound while running a bike on the dyno. Let me tell you, Duke sure put a lot of thought into this shop...like 20 years of dreams that are finally coming true, that is!
The ever exciting hallway. The door on the right is an access door into the fab room, the first door on the left is the mechanical room and the second door on the left is the bathroom.
Inside the mechanical room, where some day there will be boiler to heat the infloor heat.
And the bathroom. It is hard to see from the pic but our friend Keith stained the concrete floor a reddish-brown and let me tell you, it looks pretty darn cool!
This is the back area aka 'cold storage'. It has the option to be heated but for now it is going to serve as a big (34' x40') garage with pallet racking and room for all of Duke's 'toys'.
Another angle of the cold storage.Looking from cold storage back into the shop.
Oohh, there is the front garage door and the front service door.
Another view of the front shop, which is also 34' x 40'.
And these last two pictures are a little more recent. Last Friday, Duke and his friend Doug began building a workbench and the desk area for the front shop.
We are going to have to wait another week or two before the counter tops are in to finish it though. Oh, and you can see there is now electricity and ceiling fans! I can hardly contain myself!!
I am also proud of myself because I have been watching the Menards ads and I managed to get a toilet for $39 after rebate! Woo Hoo for cheap toilets. I also picked up a faucet for the sink the other day and today I found some roller shades for the windows.
It will be nice when we can FINALLY clean out our garage and shed at our house. I just have to keep reminding myself that it is getting closer by the day!

post signature

Wednesday, June 9, 2010

Lookin' more like a shop.

I guess it is about time I update on the progress of our new shop...so here goes! You may want to pop a bag of popcorn and grab a drink cause this one is a doozy!!!
The metal showed up on Fri, May 21st and the construction crew was there bright and early on Mon the 24th to get started on the roof.
That day the completed the entire roof and the North side wall, including the windows. It was so cool to finally get a glimpse of what our color choices would look like in real life and not just on a color simulator online.
By the end of Tues the 25th they had the metal up on the East (gable) end as well the South sidewall.
I can not believe how quickly these pole barns can come together!
Luckily, the weather was in full cooperation for construction week because whenever it rains, the entire driveway and around the building turn to complete SLOP!
Here is a super exciting view of the soffit. It is a taupe color to match the windows, overhead doors and the service doors.
And a view from inside the shed with most of the metal on.
And by the end of Wed the 26th, this is how the project looked. (The overhead doors are still not in and we still have to paint the service doors, but you get the idea)
The plumber also worked on Wed to get everything ready for the floor drains, sinks, bathroom, etc.
And the kids enjoyed exploring and seeing all of the changes each day.
Here is a view from the East (gable) end where the 'cold' storage area will be.
And another exciting shot of the taupe window with the antique bronze framing.
Now you have to be honest...what do you think of the colors? I know the garage doors aren't on yet and that will make a huge difference tying things together but use your imagination.
On Thurs the 27th the concrete guys were there prepping and getting the pits dug for the dyno and the motorcycle lift tables (sinking them into the floor so they are flush with the concrete)
More exploring...
Here is a shot of the dyno pit and some of the plumbing...
A few days of rain ensued and then on Wed June 2nd, the concrete guys were back to prep the dirt and worked until about 10:30 pm. Then on Thurs June 3rd they came back around 4:30 pm to lay down the pink Styrofoam for underneath the the in-floor heat tubing as well as the tubing itself.
I had stopped after work and then returned later in the evening with snacks for the guys since they all missed eating supper.
I left around 9 pm to get the kids home to bed and the guys ended up burning the midnight oil and were there until after 1 am!!! They had to get all of the tubing laid because the concrete trucks were set to arrive at 6 am. Those poor guys must have been exhausted!!!
It had rained over night but that didn't stop them from moving forward with the concrete. There were 3 cement trucks there and the excavator's 2 dump trucks and equipment at 7:15 am when I drove by. It looked something like a construction circus if you ask me!
The excavator buried the holding tank and also pushed in and covered up an old house foundation that was in the woods by the road.
And no, the picture above is not a beer can grave. That is one of the 2 pits where the motorcycle lifts will go. As of today they have concrete bottoms but I haven't downloaded those pics yet as we had Grant's first night of T-ball tonight (a post on that is soon to come as well!)
The big pit that Grant is looking into is the one where the dyno will go. That too now has a concrete bottom. Below is a view from the back of the shed (the dyno pit is to the right and will be in it's own room and the other 2 pits are straight ahead and to the left.)
You don't think I would go an entire long boring post without rewarding you at the end with pictures of my two sweet kiddos, do you?
While hanging out on Fri evening with the concrete guys, Grant ate nearly half his weight in watermelon.
And Audrey is good for eating just about anything you put in front of her so she ate her fair share as well!
The concrete had to cure for 5 days or so before the construction guys can bring in their equipment to start insulating and framing the interior walls but, the 5 days is up, the insulation has been delivered so they should be there bright and early tomorrow to start on another round of progress!

post signature

Our Blogger Templates Web Design